Improving Mid-term, Intermediate, and Long-range Cost Forecasting
Author | : Jorge A. Rueda Benavides |
Publisher | : |
Total Pages | : 56 |
Release | : 2020 |
ISBN-10 | : 0309673445 |
ISBN-13 | : 9780309673440 |
Rating | : 4/5 (45 Downloads) |
Download or read book Improving Mid-term, Intermediate, and Long-range Cost Forecasting written by Jorge A. Rueda Benavides and published by . This book was released on 2020 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: Because transportation investment programs have extended time horizons, state departments of transportation (DOTs) must forecast costs well into the future. This poses a serious challenge: the longer the time horizon, the more uncertainty and risk that forecasted costs will vary from actual, future costs. The TRB National Cooperative Highway Research Program's NCHRP Research Report 953: Improving Mid-Term, Intermediate, and Long-Range Cost Forecasting: Guidebook for State Transportation Agencies presents a cost forecasting method for use by state transportation agencies that better accounts for cost variability and economic volatility over time. Supplemental information to the report includes a cost forecasting toolkit, a guidebook presentation, and videos.