Managing Railway Operations and Maintenance

Managing Railway Operations and Maintenance
Author :
Publisher :
Total Pages : 483
Release :
ISBN-10 : 0952999722
ISBN-13 : 9780952999720
Rating : 4/5 (22 Downloads)

Book Synopsis Managing Railway Operations and Maintenance by : Robin Hirsch

Download or read book Managing Railway Operations and Maintenance written by Robin Hirsch and published by . This book was released on 2007 with total page 483 pages. Available in PDF, EPUB and Kindle. Book excerpt:


Managing Railway Operations and Maintenance Related Books

Managing Railway Operations and Maintenance
Language: en
Pages: 483
Authors: Robin Hirsch
Categories: Railroads
Type: BOOK - Published: 2007 - Publisher:

DOWNLOAD EBOOK

Railway Management and Engineering
Language: en
Pages: 500
Authors: V Profillidis
Categories: Business & Economics
Type: BOOK - Published: 2017-11-30 - Publisher: Routledge

DOWNLOAD EBOOK

In a rapidly changing world, with increasing competition in all sectors of transportation, railways are in a period of restructuring their management and techno
Railway Transportation
Language: en
Pages: 0
Authors: S. Ponnuswamy
Categories: Railroad engineering
Type: BOOK - Published: 2012 - Publisher: Alpha Science International, Limited

DOWNLOAD EBOOK

RAILWAY TRANSPORTATION is an up-to-date presentation of essential features of railways with special emphasis on the engineering aspects. The coverage includes a
EXCELLENCE IN METRO OPERATIONS AND MANAGEMENT
Language: en
Pages: 517
Authors: SHARMA, SHARAT
Categories: Technology & Engineering
Type: BOOK - Published: 2022-12-19 - Publisher: PHI Learning Pvt. Ltd.

DOWNLOAD EBOOK

The challenges in metro operations keep the operations managers on their toes to continually explore innovative ways to resolve the day-to-day issues and keep t
Operations research models for scheduling railway infrastructure maintenance
Language: en
Pages: 190
Authors: Gabriella Budai-Balke
Categories:
Type: BOOK - Published: 2009 - Publisher: Rozenberg Publishers

DOWNLOAD EBOOK

This thesis can be divided into two parts. In Part I we are dealing with the problem of finding optimal time intervals for carrying out routine maintenance work