An Analysis of Cost Overrun in the Construction Industry

An Analysis of Cost Overrun in the Construction Industry
Author :
Publisher :
Total Pages : 68
Release :
ISBN-10 : OCLC:1240734224
ISBN-13 :
Rating : 4/5 (24 Downloads)

Book Synopsis An Analysis of Cost Overrun in the Construction Industry by : Abhinav Goyal

Download or read book An Analysis of Cost Overrun in the Construction Industry written by Abhinav Goyal and published by . This book was released on 2017 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: This thesis presents a literature research analyzing the cost overrun of the construction industry worldwide, exploring documented causes for cost overrun, and documented parties responsible for the inefficiency. The analysis looks at a comparison between the metrics of construction projects in different continents and regions. Multiple publication databases were used to look into over 300 papers. It is shown that although construction demands are increasing, cost overrun on these projects is not decreasing at the same rate around the world. This thesis also presents a possible solution to improve cost overrun in the construction industry, through the use of the Best Value Performance Information Procurement System (BV PIPS). This is a system that has been utilized in various countries around the world, and has documented evidence that it may be able to alleviate the overrun occurring in the construction industry.


An Analysis of Cost Overrun in the Construction Industry Related Books

An Analysis of Cost Overrun in the Construction Industry
Language: en
Pages: 68
Authors: Abhinav Goyal
Categories: Construction industry
Type: BOOK - Published: 2017 - Publisher:

DOWNLOAD EBOOK

This thesis presents a literature research analyzing the cost overrun of the construction industry worldwide, exploring documented causes for cost overrun, and
Root Cause Analysis of Cost Overrun in Construction Projects Under Different Market Sectors
Language: en
Pages: 39
Authors: Rami Sarakbi
Categories: Budget process
Type: BOOK - Published: 2019 - Publisher:

DOWNLOAD EBOOK

Abstract: A project is pronounced successful if it is finished on time within the budgeted value. Cost overruns and time overrun (delays) have been a critical p
A study investigating the factors that cause delays and cost overruns in construction projects in India
Language: en
Pages: 47
Authors: Kushal Agrawal
Categories: Technology & Engineering
Type: BOOK - Published: 2014-02-01 - Publisher: diplom.de

DOWNLOAD EBOOK

Anyone who has got a rework or renovation work done in their house can tell you what a troublesome activity it is. Not only that, it seems to take forever to be
Advances in Geotechnics and Structural Engineering
Language: en
Pages: 700
Authors: Sanjay Kumar Shukla
Categories: Science
Type: BOOK - Published: 2021-04-29 - Publisher: Springer Nature

DOWNLOAD EBOOK

This book comprises select proceedings of the International Conference on Trends and Recent Advances in Civil Engineering (TRACE 2020). The book focuses on the
Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate
Language: en
Pages: 1500
Authors: K. W. Chau
Categories: Business & Economics
Type: BOOK - Published: 2017-12-18 - Publisher: Springer

DOWNLOAD EBOOK

This book presents the proceedings of CRIOCM_2016, 21st International Conference on Advancement of Construction Management and Real Estate, sharing the latest d