Hanford Waste Treatment Plant: Department of Energy needs to Strengthen Controls over Contractor Payments and Project Assets

Hanford Waste Treatment Plant: Department of Energy needs to Strengthen Controls over Contractor Payments and Project Assets
Author :
Publisher : DIANE Publishing
Total Pages : 46
Release :
ISBN-10 : 1422397505
ISBN-13 : 9781422397503
Rating : 4/5 (05 Downloads)

Book Synopsis Hanford Waste Treatment Plant: Department of Energy needs to Strengthen Controls over Contractor Payments and Project Assets by :

Download or read book Hanford Waste Treatment Plant: Department of Energy needs to Strengthen Controls over Contractor Payments and Project Assets written by and published by DIANE Publishing. This book was released on 2007 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt:


Hanford Waste Treatment Plant: Department of Energy needs to Strengthen Controls over Contractor Payments and Project Assets Related Books

Hanford Waste Treatment Plant: Department of Energy needs to Strengthen Controls over Contractor Payments and Project Assets
Language: en
Pages: 46
Hanford Waste Treatment Plant
Language: en
Pages: 48
Authors:
Categories:
Type: BOOK - Published: - Publisher: DIANE Publishing

DOWNLOAD EBOOK

Hanford Waste Treatment Plant
Language: en
Pages: 48
Authors: United States Government Accountability Office
Categories:
Type: BOOK - Published: 2017-09-15 - Publisher: Createspace Independent Publishing Platform

DOWNLOAD EBOOK

In December 2000, the Department of Energy (DOE) awarded Bechtel National, Inc. (Bechtel) a contract to design and construct the Waste Treatment Plant (WTP), on
Department of Energy: Contract and Project Management Concerns at the National Nuclear Security Admin. and Office of Environmental Management
Language: en
Pages: 23
Authors: Gene Aloise
Categories: Technology & Engineering
Type: BOOK - Published: 2010-02 - Publisher: DIANE Publishing

DOWNLOAD EBOOK

The Dept. of Energy (DoE) manages over 100 construction projects with estimated costs over $90 billion and 97 nuclear waste cleanup projects with estimated cost
Committee on Appropriations House of Representatives, January 2, 2009, 110-2 House Report 110-932, *
Language: en
Pages: 64