Tampa Electric Company, Polk Power Station Unit No. 1, Preliminary Public Design Report

Tampa Electric Company, Polk Power Station Unit No. 1, Preliminary Public Design Report
Author :
Publisher :
Total Pages : 146
Release :
ISBN-10 : OCLC:68391618
ISBN-13 :
Rating : 4/5 (18 Downloads)

Book Synopsis Tampa Electric Company, Polk Power Station Unit No. 1, Preliminary Public Design Report by :

Download or read book Tampa Electric Company, Polk Power Station Unit No. 1, Preliminary Public Design Report written by and published by . This book was released on 1994 with total page 146 pages. Available in PDF, EPUB and Kindle. Book excerpt: This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company's Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE's project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.


Tampa Electric Company, Polk Power Station Unit No. 1, Preliminary Public Design Report Related Books